CityStructure - Feasibility Study simplified
Unsplash

Unsplash

How Much Does It Cost to Build a Granny House?

Building a granny house, or ADU, can be a smart investment, but understanding the costs involved is crucial. Costs can vary greatly based on size, location, and type of ADU. Key factors affecting the cost include hard costs like materials and construction, as well as soft costs such as permits and design fees. Estimating these expenses and exploring strategies to keep the project affordable will help in managing your budget effectively.

Factors That Affect the Cost of Building an ADU

Building an ADU (Accessory Dwelling Unit) can add value to your property and provide extra living space, but the cost varies based on several factors. Understanding these factors will help you estimate your budget more accurately.

Size

The cost of building an ADU is closely tied to its size. In California, ADUs usually range from 150 to 1,200 square feet, with most new builds between 600 and 1,200 square feet. Detached ADUs need more space due to setback regulations while converting existing structures makes use of existing space. Costs per square foot can vary from $150 to over $600, depending largely on the size of the ADU.

Location

The cost of building an ADU can vary significantly by location. Here’s a rough estimate of costs per square foot in different California regions:

  • Bay Area: $400–$600
  • Los Angeles: $250–$400
  • San Francisco: $350–$900
  • San Diego: $300–$600

For a more precise estimate based on your specific location, consulting with local professionals is crucial. Also, look into local programs or incentives that might reduce overall costs.

Type of ADU

The type of ADU you choose can greatly affect the overall cost. Here’s a breakdown of different ADU types:

Basement Conversion ADU. Converting a basement into an ADU usually costs between $60,000 and $150,000. These are often more affordable because they use existing infrastructure like foundation walls and utilities.

Garage Conversion ADU. Converting a garage into an ADU generally costs between $60,000 and $150,000. Costs can rise if the garage has water damage or structural issues, or if it’s small (around 350 sq ft).

Attached ADU. Connected to your main home but with separate living space, attached ADUs cost between $100,000 and $216,000. They may save on costs compared to detached units due to easier access to utilities.

Above-Garage ADU. Built on top of an existing garage, these units typically cost between $128,000 and $225,000. Costs may be higher if the garage needs structural reinforcement to support the new unit.

Detached ADU. These units are the most expensive, ranging from $110,000 to $285,000. This higher cost covers the construction of the unit and the installation of separate utility lines. Many homeowners also add solar panels, which can add about $3,500 to the total cost but offer long-term savings.

Is now a good time to get a Zoning Analysis for your property?

Soft Costs

In addition to construction expenses, there are other costs to consider, known as "soft costs." These usually makeup 10-15% of the total project budget in California and can include permits, architectural fees, and impact fees. Accounting for these costs early on can help you plan better and avoid unexpected expenses.

Design Cost

Architectural design is a significant part of the ADU project budget. Architectural fees generally range from 10% to 15% of the total project cost. For an ADU costing around $240,000, this means fees could be between $24,000 and $36,000. This covers services like:

  • Creating initial design concepts and floor plans based on your needs.
  • Obtaining necessary permits and ensuring the design meets local building codes.
  • Preparing detailed construction documents to guide the building process.

Consultation Cost

Building an ADU often requires various professional consultations:

Structural Engineer. Ensures that the ADU's frame and foundation can support its weight and meet local codes.

Title 24 Energy Consultant. Checks the design to comply with California’s energy efficiency standards, which could save on utility bills.

Boundary/Site Surveyor. Defines your property’s boundaries and dimensions for accurate construction and permits.

These consultations generally cost between $8,000 and $12,000 in California, but the amount can increase depending on the project's complexity. Depending on local regulations and property specifics, you might also need consultations with other specialists, such as geotechnical engineers or fire safety experts.

Permit Cost

Obtaining permits is a key step in building an ADU. There are two main types of costs:

Building Permits. These are issued by the local planning department and usually range from $2,000 to $10,000, depending on the location, size, and complexity of the ADU.

City Fees. Additional fees set by local authorities typically range from $3,000 to $11,000. These also vary based on location, size, and value of the ADU.

For ADUs over 750 square feet, some areas may charge Impact Fees. These fees are based on the size of the ADU relative to your main house and help cover the costs of infrastructure and public services.

An ADU Analysis includes referrals to professionals to simplify the permitting process.

Hard Costs

Building an ADU (Accessory Dwelling Unit) involves various expenses known as "hard costs," which include all the visible and tangible parts of the project. These costs usually make up 85-90% of the total budget. The actual cost will depend on the size, design choices (like high-end finishes), and complexity of the project.

Building Materials

Building materials are a major part of your ADU budget, usually accounting for 45-50%. This includes:

Structural Components. Lumber, sheathing, and joists form the framework of your ADU, providing the necessary support.

Exterior Elements. The roof, windows, and doors are essential for protection from the weather, allowing natural light, and enhancing the look of your ADU.

Finishing Touches. Trim, cabinetry, and other interior details contribute to the functionality and appearance of the space.

Site Preparation

Before construction begins, preparing the site is essential. Site prep involves:

Land Leveling. Ensuring the area is flat and even for a stable foundation.

Grading. Adjusting the land’s slope for proper drainage.

Clearing the Area. Removing trees, shrubs, or debris to create a clear workspace.

Site preparation costs typically range from $1,000 to $5,800, depending on the size and complexity of the area.

Foundation

The foundation supports your ADU. Concrete foundations usually cost between $4 and $25 per square foot. For ADUs ranging from 600 to 1,200 square feet, this translates to $2,400 to $30,000. However, some ADUs may not need a new foundation:

Garage Conversions. Often don’t require a new foundation as the existing garage structure supports the ADU.

Basement Conversions. Might not need a new foundation if the basement structure is sound.

Above-Garage ADUs. Typically requires extra support for the existing garage.

Framing

Framing forms the skeleton of your ADU and typically costs around $25,000. Costs vary by material:

Lumber. Generally costs $350 to $500 per 1,000 board feet and is a common, cost-effective choice.

Metal Framing. Offers increased durability and fire resistance but costs about 10% more than lumber framing.

Finishing

Finishing transforms the ADU from a functional structure into a livable space. Costs can range from $10 to $60 per square foot for basic finishes, including insulation, drywall, flooring, walls, ceilings, and stairs. Premium materials and fixtures can push this cost over $150 per square foot. Finishing costs vary based on:

ADU Type. Converting a basement usually requires less finishing than building a new detached unit.

Budget and Preferences. The level of investment in materials and features depends on your budget and desired look. Finishing costs for a basement conversion might range from $2,800 to $34,500.

Systems

Three key systems are essential for your ADU:

Electrical Wiring. Powers lights, appliances, and outlets, costing between $1,000 and $2,500.

Plumbing. Includes water lines, drains, and fixtures, typically costing around $900.

HVAC System. Provides heating and cooling, with a small furnace and AC unit costing about $6,000.

Additional costs might include solar panels, which generally range from $2,500 to $3,500, depending on your energy efficiency goals and local regulations.

Post-Construction Cleanup

After construction, cleaning up the site is necessary. Cleanup costs typically range from $0.10 to $0.50 per square foot, translating to $60 to $600 for standard-sized ADUs. Costs vary based on:

ADU Size. Larger ADUs require more cleaning.

Level of Dirt and Debris. More debris means higher cleaning costs.

Choice of Cleaning Service. Rates and services can vary, so comparing quotes is important.

Waste Disposal

Proper disposal of construction waste is crucial. Costs typically range from $100 to $600, depending on the amount of waste:

Smaller Projects. Waste disposal might cost around $100.

Larger Projects. More waste can push costs up to $600.

Considerations include:

Truckload. Full truckloads may cost more.

Dumpster Rentals. Renting a dumpster for larger projects typically costs between $300 and $600 per week.

CityStructure ADU Analysis calculates the maximum ADU area for the highest return.

Strategies for Making Your ADU More Affordable

Building an ADU can be a great investment, but managing costs is important. Here are some practical tips to keep your ADU project within budget:

Balancing Budget and Durability

Choose materials that are both affordable and durable. For example, quartz countertops look similar to marble but are more stain-resistant, which can save you money on replacements in the long run.

Embrace Simplicity

Work with a designer to create a straightforward design that’s both beautiful and functional. Avoid unnecessary features or complex layouts to keep costs down while still achieving a stylish result.

ADU Contractor Expertise Matters

Choosing the right contractor is crucial. Here’s why:

Local Knowledge Advantage

Regulations for ADUs can vary widely between different areas. A contractor familiar with local rules can ensure your project meets all requirements from the start.

Avoiding Delays and Cost Overruns

A contractor who understands local regulations can prevent costly delays and rework by navigating the permitting process efficiently. Look for contractors with experience in your area to avoid potential setbacks.

Minimizing Delays in Your ADU Project

Keeping your ADU project on schedule helps manage costs and reduce disruptions. Here’s why:

Impact on Costs. Delays increase costs due to longer labor and site expenses.

Predictability and Efficiency. A clear timeline helps manage expectations and coordinate with contractors effectively.

Minimizing Disruption. Staying on schedule reduces the length of construction-related inconveniences.

Strategies for Success:

  • Thorough Planning: Work with your contractor to create a realistic timeline, considering permits, material lead times, and potential delays.
  • Clear Communication: Keep in touch with your contractor regularly. Discuss any issues early to find solutions and keep the project on track.
  • Contingency Plans: Be ready for surprises. Have a plan for handling potential delays, such as adjusting the schedule or sourcing materials differently.

Explore Pre-designed ADU Options

Consider pre-designed ADUs as a cost-effective solution. These designs can speed up the project and reduce design fees. Some areas, including parts of California and Washington, offer pre-approved designs that simplify permitting. While these may not be custom-built, they can be personalized with professional guidance to fit your needs and budget.

ADUs are a great way to add value. Learn how much they could add to your property.